London

Sycamore House

LOCATION | London
Main Contractor | ELECISERVE

Sycamore House – London

This project was a complete Cat A fit-out at Sycamore house in central London.

The strip out and installation was for all 6 floors. The scope of this project was to include a 8 way Ryefield board and new main MCCB Panel board to accommodate all floors and the basement.

Each floor was supplied with it‘s own 3 phase Schneider distribution board comprising of small power and lighting for each office space and toilets.

All lighting installed is high end with EX-OR by honeywell lighting control.

Emergency lighting and category L1 fire alarm system has been installed throughout along with a video intercom access control system.

A fresh moderm office space was delivered to the client despite the last 5 months being undertaken during the Covid 19 Pandemic.